Property Updates & Improvements

2016

The back bathroom en-suite to bedroom #11 was completely redone. This first floor bath is now handicap accessible yet still provides a feeling of luxury. Features include a curbless shower with easy entry by Schluter, Grohe shower and faucet fixtures with new KOHLER San Souci Comfort Height one‑piece commode. The new banjo style counter top made from Wana, Louro vermelho is from the boatyard of Gannon and Benjamin. The floor now features radiant heat. All tile is Porcelanosa from Spain and was installed by Skip Dostal off MV Real Estate.

Complete repainting, gutter repair and roofing of the North side of the house.
Complete repainting of the front and back of the house and the Morse street fence. Interior painting.

New front door railing over the portico. The old one was as rotten as possible to be.

New garden gate, raised for more privacy with a new 4 foot tall privets.

New Johnathan Green “Black Beauty” sod lawn from Sodco of Rhode Island

Updated electrical outlets on second floor and upgraded lighting and fan on back of first floor

New drapes and upholstery were done by Nancy Johnson in Bedroom #2, the Cat Room. New shades with the ability to either go up from the bottom or come down from the top were installed

New 36″ GE Monogram stove and Beverage Center

New patio table and chairs with seating for 16 courtesy of Vineyard Decorators

2015

Major work was completed before the snow flew but painting the the 2nd floor of the porch awaited.

The weather closed in before we were able to start the second floor but we got started on it this May 12th. The rot was extensive and required dismantling most of the second floor deck and the replacement of about half of the beams. We used 9 sheets of 4’x8’x1″ 25mm Meranti Marine plywood for the underlayment. We then finished the plywood with a liquid rubber membrane waterproofing made by Ames Research. Finally we rebuilt and then re-hung the railings.

Due to the cold weather this spring the drying was slowed considerably and we were not able to apply more than one coat a day. Since the system called to use all of two 5 gallon pails we needed 10 days plus to apply the coatings. On good days we could apply thin coats in the morning and afternoon.

The porch is now set for another 150 years.

Before link here

Project parameters here

2014 Porch Rebuilding

2014 Porch Rebuilding

Each year we make many improvements to the property. Some are routine like painting but many are major. With a home that is over 175 years old there is always something to update or fix.

2014

  • Complete rebuild of the front porch
  • Repaint and repair chimneys
  • Repaint the 3rd floor dormers and the western backyard side of the house
  • New paint inside
  • New rugs

2013

  • Installed 100 amp electrical service to the backyard to support weddings and functions.
  • New overhead lighting in the tool shed
  • Installed dual ASUS ASUS RT-AC66U Dual-Band Wireless-AC1750 Gigabit Router
  • New Motorola SURFboard SB6141 DOCSIS 3.0 Cable Modem
  • TRENDnet 8-Port Unmanaged Gigabit Switch
  • New Denon AVR-X2000 – 7.1 Network Receiver – Air Play – SiriusXM – Pandora for whole house sound
  • Improved HVAC controls.
  • Renovated the front basement area with drylock and epoxy paint – dryer and fresher house.
  • Installed a new invisible screen so now both access areas to the front porch are screened.
  • Rebuilt the Bull Texan BBQ and provided a new rotisserie and grill lighting.
  • New Krups and Black and Decker toasters, kitchen accessories and door mats
  • New lighting over the two kitchen sinks.
  • New shelving around the refrigerator in the front kitchen for a built in look
  • New Panasonic silent bathroom pans with Leviton 10-20-30-60 Minute Countdown Timers
  • 8 Yoga mats for front bedrooms

2012

  • Floors sanded and re-finished through the entire house. The front porches and interior baseboard were repainted.
  • New upholstery for the front living room furniture.
  • Major upgrades to the lighting and electric in both living rooms.
  • Speakers added in both living rooms, dining rooms and the back patio with local volume controls.
  • Four new laundry appliances. Front loading LG steam washers and dryers so all linens are washed in house.
  • Renovated the back basement with paint, electric and upgraded lighting for the new laundry facilities.
  • Replaced the roofs on the tool shed and over the back entrance.
  • Replaced approximately 100 feet of wooden gutter and replaced the back bedroom fascia.
  • Upgraded internet and computer.

2011

  • Removed the old oil tank that took up space in the back laundry area as per DEM specifications.
  • New deluxe air mattress sleeper sofa in front game room and two new chairs.
  • Replaced the older furniture in the back family room.
  • New combination lock system for main entry.
  • Two new Umbrellas and new SS grill for the back patio.

2010

  • Purchases 5 new bicycles for the use of our guests.
  • Added a wine cooler and new lighting for the back bar.
  • New lighting in the front hall.
  • New box frame in the master bedroom to compliment new mattress.
  • Added Internet controlled thermostats for comfort and fuel savings.
  • Reset the stones in the back walk area.
  • Improved the HVAC system and 3rd floor bathroom.
  • Painted the Morse Street side of the house, gate and fence.
  • Fixed the roof and gutters.
  • New back patio furniture.

2009

  • New central air-conditioning and gas fired heating system installed.
  • Renovated both the front and rear kitchens with new cabinets, granite counter tops and gourmet appliances.
  • Extensive interior and exterior painting.
  • Both dining room tables refinished.
  • The front game room was re-configured with an updated bathroom and large flat screen TV and DVD player.
  • New lawn and new irrigation system.
  • New WiFi internet service is house wide and has been improved for the 2009 season.

2008

  • Interior is substantially re-painted.
  • Bathrooms are tiled.
  • Plans are made to improve the residence for rental use.

2007

  • The home is put onto the rental market.
  • 6 bathrooms are renovated and tiled.
  • 3rd floor is renovated

1956

  • The original kitchen is reconfigured to a dining and living area to serve the back of the house.
  • Two kitchens are installed along with a system to rent the back of the house out separately from the front.
  • Child’s playhouse is built but is later turned into a tool shed.

1955

  • Property is purchased by my father from the estate of Mrs. Dinsmore